Workforce scenario planning: location shifts and multi-year costs

A useful workforce scenario makes an operational change concrete and recalculates its headcount, FTE, timing and cost consequences against a known baseline.

HC Controller product documentationUpdated 8 October 2026Definitions and examples; not legal advice

Choose a governed baseline

Select an approved budget, target or forecast vintage. Keep the scenario separate so its calculations cannot overwrite the baseline.

Apply position-level levers

As a hypothetical exercise, move 100 planned US roles to Poland with a start month. Keep Group HC constant if no net roles are created or removed; calculate local HC and salary/FTE cost effects by applicable rules.

Include the full time axis

Show current-year, next-year and five-year results, including monthly phasing, FX rates and any one-time transition costs that have approved assumptions.

Treat approval as a separate action

A calculated saving is not an approved restructuring decision. Approved targets and business plans change only through designated review and authorization.

About the examples: All numerical examples are illustrative. Actual results depend on your defined workforce population, source coverage, effective dates, pay rules and currency assumptions. Planned position detail is not proof of individual actual occupancy.